Welcome to www.mcqtutorial.com!!!!
      
      
MCQ Tutorial Search
Home Search Add Question Today's History Discussion Board Job Portal Quality Assurance

Manual Testing

White Box Testing Black Box Testing Automation Testing Action Based Testing Data Driven Based Testing Performance Testing Mock Test Contact Feedback
Home
Search
Add Question
Today's History
Discussion Board
Job Portal
Quality Assurance

Manual Testing

White Box Testing
Black Box Testing
Automation Testing
Action Based Testing
Data Driven Based Testing
Performance Testing
Mock Test
Subscribe/Unsubscribe
Email:
Social Media
Facebook

Misc Tutorials

References

Question and Answer Tutorial
Tutorials Point
Stack Overflow

MCQ Tutorial - Quality Assurance->Manual Testing

First Previous 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 ... Next Last
1.) When "What is visible to end-users is a deviation from the specific or expected behavior", this is
called:
Options are:
A.) A defect
B.) A failure
C.) An error
D.) A fault
2.) Out of which, Regression testing should be performed:

   a.) Every week
   b.) After the software has changed
   c.) As often as possible
   d.) When the environment has changed
   e.) When the project manager says

Options are:
A.) b is true, a, c, d and e are false
B.) b & d are true, a, c and e are false
C.) b, c and d are true, a and e are false
D.) a and b are true, c, d and e are false
3.) IEEE 829 test plan documentation standard contains all of the following except:

Options are:
A.) Test environment
B.) Test tasks
C.) Test items
D.) Test specification
                        
4.) Testing should be stopped when:

Options are:
A.) All the planned tests have been run
B.) All faults have been fixed correctly
C.) Time has run out
D.) It depends on the risks for the system being tested
5.) Order numbers on a stock control system can range between 10000 and 99999 inclusive. Which of the
following inputs might be a result of designing tests for only valid equivalence classes and valid
boundaries:

Options are:
A.) 1000, 5000, 99999
B.) 10000, 50000, 99999
C.) 9999, 10000, 50000, 99999, 10000
D.) 9999, 50000, 100000
First Previous 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 ... Next Last
Comment:
Name:Email:
Contact No.:
Copyright © 2014 by SBJ Group. All Rights Reserved. Developed and maintained by SBJ Group. Supported on Internet Explorer browser only